Commercial Projects
This section highlights a few of the hundreds of projects where Water Energy Design services were provided for earth-coupling design.
Chewonki Northern Exposure Article
Chewonki Performance Data Monitoring
Chewonki Geothermal Retrofit: Geothermal Energy The heat beneath our feet
Chewonki Energy "Pathways": The Sustainability Office is the hub of Chewonki's leading-edge conservation and energy curriculum
Chewonki Sustainable Energy Podcast: "Geothermal: The Dark Horse of Renewable Energy"
An in-depth explanation of geothermal heating: How it works, what is the payoff, and why more people don't know about it. Features an interview with industry expert John Logan, Regional Director of Water Energy Distributors.
South Cove Activity Center, Grantham NH
Installed and fully operational in July 2009.

16,000 SquareFtBuilding - With Pool
(New Construction)
The comfort offered by the system and the ease of operations have been outstanding. Our Partnership with Water Energy has been and continues to be outstanding. They have been extremely patient with the education process and were dependable partners during the construction process. This project has been so successful …our geothermal system is projected to pay for itself in terms of energy savings within 3-5 years… the community is now considering converting an existing facility to geothermal in the future!
Ken Ryder
General Manager Eastman Community
603-863-4240
The Building was selected from more than 2,500 nominated projects as a Green Building of America Award-winning project.
Installed by: M.J. Hayward, West Lebanon, NH (603)298-6981
Geothermal Earth Coupling Designed by: Water Energy Distributors Geothermal
Wells Installed by: Cushing & Sons- Walpole, NH (603)352-8866
36 tons of Water to Air Climate Master Tranquility 20 Heatpumps
Gustavo Preston Chelmsford, MA
Installed and fully operational in June 2008.

11,000SquareFtBuilding
(New Construction)
"We have been very impressed with the geothermal system. It has been very efficient. Even in the hottest weather I find that people ask me to turn the A/C down. It is that cool. I would recommend this for anyone who builds a new building like we did."
Bill Hurley:
Operations Manager 978-250-3333
Installed by: Excell Mechanical- Somerville, MA (617)628-1144
Designed by: Hancock Associates- Marlborough MA
Geothermal Wells Installed by: Wilmington Pump- Wilmington, MA (978)658-9111
Currently Maintained by: Excell Mechanical-Somerville, MA
21 tons of Water to Air Climate Master Tranquility 20 Heat pumps
Haverhill Public Library, Haverhill MA.
Installed and fully operational in January 1995

44,000 Square Foot Building (retrofitted)
Average 2008-2009 $1.79/sq. Ft. Heating, Cooling,
All Electric Lights, Computers, Equipment and Services
"We don’t even realize we have Geothermal until we get the bill at the end of the Month and see how inexpensive it is!"
Ed Nelson:
Business Manager
978-373-1586
Phase 1 was Installed by: Uptack Plumbing & Heating (978) 372-8503 in 95’ 60 tons of Water to Water
Phase 2 was installed by Walsh Mechanical (781) 871-7496 in 97’ 55 tons of Water to Air Addition
Phase 1 & 2 was Engineered by: Evert Lindgrin Associates
Geothermal Wells Installed by: Wilmington Pump (978) 658-9111
6- 10 ton Water to Water WE120’s and 55 tons of Water to Air TSH’s
Rivers Edge Apartments, Durham NH.
Installed and fully operational in July 2009

42,000 SquareFtBuilding (New Construction)
"I am very happy with the geothermal system, it runs very quietly and is keeping all of the apartments cool during the summer. I would recommend this to any new construction project."
Jeff White:
Operations Manager
Geothermal Earth Coupling Design by: Water Energy Design - Hampstead NH (603) 329-8122
Geothermal Wells Installed by: Skillings & Sons-Amherst NH (603) 459-2600
Currently Maintained by: Ultra Geothermal
103 tons of Water to Air Climate Master Genesis Heat pumps